Project duration was one year and was to provide and install all the engineered false work and to remove existing structural components and replace main pin joints. BSE removed and replaced the existing structural deck and installed a completely new walkway and handrail system.
They said it couldn't be done! But we used our HC-278HII Link Belt 300-Ton Truck Crane and our Krupp GMK5175 to set our MC-790 70-Ton Lorain Truck Crane on top of a parking deck to set the structural steel.